Back to Top
North Dorset Railway

Summaries of news items are shown below. For more information click on the stories or go to our Facebook page which is updated regularly and contains more photos and other details.

Visit our Facebook page for more news and pictures:          

<< < 1 2 3 4 5 6 7 8 9 > >>
30075 achieves its boiler certificate

30075, one of the ‘Yankee Tank’ steam locomotives being restored by the Project 62 group at Shillingstone Station, achieved its boiler certificate. The 1960 engine, built in Yugoslavia to an American design, had done service at many heritage rail ...

read more ≻≻
The 'Cannington' coach arrives

A railway coach dating to the 1880s was brought to the station. It is thought to have been withdrawn from service on the S&D in the 1930s, and somehow ended up as a changing room at a tennis club. It was rescued by a railway buff who installed it ...

read more ≻≻
Testing the Wickham Trolley

The Wickham Trolley began a programme of engine-tuning, brake testing and driver training. A similar trolley – used for carrying track inspection personnel – was based at the station until its closure, but this 1959 model came to Shillingstone in ...

read more ≻≻
Visit from the Yeovil Vintage Car Club

Shillingstone Station welcomed a visit from the Yeovil Vintage Car Club. In all, 34 enthusiasts arrived in a variety of classic vehicles, to enjoy a cream tea in the Mk I carriage. ...

read more ≻≻
The last track of the Northern Extension was laid

On a hot afternoon, a Permanent Way team of 12 volunteers laid the last track of the 400m extension, connecting to existing track. Operations manager Phil Jacques placed the final ‘golden’ screw and it was driven home. He then thanked the team fo ...

read more ≻≻
Visit by BBC South

A BBC team visited the station to record material for a Railway 200 special in September. Reporter Briony Leyland and cameraman Daniel Jojo interviewed NDR chairman Gavin Collins, former Shillingstone signalman Bob Downes, and volunteer John Coulbert ...

read more ≻≻
Installation of the 'Binegar' crane

A hand-operated crane originally located at Binegar station in Somerset was installed on the station’s loading dock. In 1904 a narrow gauge line was built from the Oakhill Brewery to Binegar, where the crane was used to transfer barrels onto the ma ...

read more ≻≻
Volunteer event, grand summer draw and work continues on the extension

Another busy weekend at the station. We welcomed a steady flow of visitors who had come to enquire about volunteering and are pleased that a number of them have decided to join us. Meanwhile, we conducted the draw for our grand summer draw in aid ...

read more ≻≻
Open Day and Model Railway Show success

A fantastic turnout for the Open Day/ Model Railway event today: we welcomed many hundreds of visitors who enjoyed the layouts, the guided tours, the signal box demonstrations, the ballasting demonstration, P62 visits, the stalls and, of course, the ...

read more ≻≻
Riverside car park opens

If you are visiting North Dorset Railway our new main car park is now open at Haywards Lane/Bere Marsh. At the northern edge of Shillingstone village follow the signs to turn off the A357 towards Child Okeford, pass under the railway bridge and it's ...

read more ≻≻
Final track panel in place North of bridge

On Saturday, both rails of the final panel on the North side of the bridge were fixed in place in the normal way and gauged during the process. Some slewing work was necessary for track alignment purposes. Two 60' rails for the panel over the bridge ...

read more ≻≻
Ballasting of Lamb House bridge completed

Some decent weather on Saturday allowed the Pway team to complete the ballasting of Lamb House bridge. A load of ballast was tipped on to a layer of Terram membrane on the South side of the bridge: the ballast was then spread on the bridge itself to ...

read more ≻≻
<< < 1 2 3 4 5 6 7 8 9 > >>