<< back to results
News Archive
Blog Archive +
Volunteers hard at work
DATE POSTED: 14 Feb 2024Lots of volunteers hard at it today. The Pway team were fitting the rest of the screws to the point chairs. The signallers constructed the board walk over the pulleys outside the signal box and fitted the mechanical interlocking to levers 12 and 13. Work continued on the restoration of the lamp hut. The waggoners continued with their work on the superstructure of the brake van.


