Back to Top
North Dorset Railway
<< back to results

News Archive

Blog Archive +

Panel No. 5

DATE POSTED: 28 Nov 2024

The Pway team report on their work this Wednesday: “We laid out panel number five today, ready for drilling and fixing etc. This makes 100 metres in total, or, just to get it in perspective, one quarter of the total of this phase of the project, from Cattle Creep to the station!

On Saturday the plan is to fix down and gauge the rails and to lay out another 20 sleepers ready for plugging the old bolt holes, weather permitting, of course.”