<< back to results
News Archive
Blog Archive +
News Update 3rd February 2022
DATE POSTED: 03 Feb 2022Checking the levels for the construction of the new Trailway. This will be brought down to approximately the same level as the new trackbed, which will be at about the same level as the temporary trailway. We will need to excavate to a depth of as much as one metre in places, removing the spoil that was dumped on the embankment when the industrial estate was built.
